230 KV Quezon Power Transmission Line
Maintenance
Miescor has entered its 10th year of maintaining the 35km, 230kV, double circuit Mauban-Tayabas
transmission line for Quezon Power Ltd. It was also Miescor, as a
subcontractor of BECHTEL, that undertook the engineering and
construction works for the transmission line, and it is for Miescor's
consistently strong performance - never has the line tripped - that
Quezon Power continued to renew its maintenance contract with Miescor.
Dasma-Imus-Zapote Transmission Line
Miescor undertook special foundation works, erection of 50/56m steel with 3m diameter base and stringing of double circuit bundle of four 795 MCM conductors for National Power Corporation.
Casecnan-San Miguel 230kV Transmission Line (Schedule I & II)
Miescor handled the erection works for the 89km transmission line of National Power Corporation in three schedules (foundation, erection, dressing, and stringing).
Sucat-Araneta-Balintawak Transmission Line
Miescor completed the 230kV, 90km transmission line foundation, tower erection and stringing works for Asea Brown Boveri.
500 KV Extra-High Voltage Kalayaan-Naga Transmission Line
Miescor completed 151km Kalayaan Substation Tower 167. Tower 438 foundation, erection and stringing works for National Power Corporation.
Distribution Line
San Roque Distribution Line
The San Roque distribution line was undertaken by Miescor as part of a larger power facility built by Raytheon Ebasco
Overseas Ltd. for the National Power Corporation. Miescor started
engineering work in 1998 and the construction of the 13km line in 1999.
Miescor was further contracted for the installation of load break switch, tailrace span segment, and retirement of phase conductors.